ATTACH TOP
Items Needed:
BB - 1/4-20 x 3/4in Button Head Screw (Qty: 8)
DD - 1/4-20 Flange Nut (Qty: 8)
B - Top (Qty: 1)
Process:
• Insert Top B into lower end of assembly and attach
using (8) BB and (8) DD.
• Finger tighten.
BB
Figure 5
BB
Figure 5.1
DD
DD
INSTALL LEVELING FEET
Items Needed:
LL - Screw Leveler (Qty: 4)
Process:
• Install (4) Leveling Feet LL. Some adjustments may
be necessary after cabinet is in desired location.
Figure 6
SQUARE CABINET
Items Needed:
TT - 5/32-in Hex Key
7/16-in Deep Well Socket
Socket Wrench
Square
Process:
• Place cabinet in its upright position.
• Square the cabinet and wrench tighten all bolts.
NOTE: Be sure all hardware is fully seated before
tightening.
NOTE: Make sure ALL panels are flat and square on
unit before tightening any fasteners.
5
LL