Temperature Adjustment - Lavorwash Metis Manual De Instrucciones

Generador de vapor
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
EN
> INSTALLATION AND START-UP
IMPORTANT: The machine installation en-
vironment should be kept at between 10°C and
35°C.
vedi fig. C
- Connect Steam hose ⑲ to gun and to steam
outlet ⑭,
- turn up the safety catch fig. D.
- then open the steam tap ⑮
WARNING: Danger from hot steam.
> FUELLING
DIESEL
(see fig. A) 18 l
Fill the tank with the fuel indicated on the technical
data plate (Diesel)
In order not to damage the fuel pump, ensure that
the tank never empties while running.
• WARNING: Use of unsuitable fuel may result in
dangerous situations.
WATER
(see fig. A)
see section on "WATER SUPPLY"
> TEMPERATURE ADJUSTMENT
(see fig. B)
Adjust the temperature by means of the thermo re-
gulator ⑪ situated on the control panel.
This machine is equipped with an electronic thermo
regulator to check and adjust the boiler temperatu-
re as well as the pressure from min. 5 bar to max.
10 bar.
- Connect the plug to the power socket.
- When turning the unit on, the display shows the
temperature reading in the boiler.
Adjust the temperature as follows:
- Hold the ( + ) and ( - ) buttons pressed simulta-
neously for a few seconds;
- Press the ( + ) button to increase the temperature,
or the ( - ) button to decrease it.
It is essential that the thermo regulator is set to
190°C in order to be able to work at 10 bar.
TABLE OF COMPARISON BETWEEN DEGREES CENTI-
GRADE AND STEAM PRESSURE EXPRESSED IN BAR
° C
• WARNING:
bar
152
5
-
159
6
max temperature of 190 °C.
165
7
-
170
8
or
175
9
180
10
described in this handbook,
contact qualified personnel at the
manufacturer or resale outlet.
- Adjustments can be made to adapt the machine
to various production requirements.
> STEAM AND WATER OUTPUT ADJUSTMENT
(see fig. B)
Adjust the steam and water output by using the
two knobs situated on the the left hand side of
the machine ⑦.
wet steam ;
• WARNING:
- For any subsequent adjustment, setting or
replacement of parts not foreseen in this
manual, please contact qualified personnel at
the manufacturer or resale outlet.
- Before carrying out any replacement, ensure
that the main switch is in the (0) OFF position.
> START-UP
Description of the start sequence
After carrying out all the connections and preven-
tative inspections described in the previous chap-
ters, start the machine according to the following
instructions:
- Before starting the generator, fill the tanks with
DIESEL up to the set level.
1) Press the main switch situated on the control
panel to the ( I ) ON ⑨
2) Press the BOILER ON button situated on the
control panel to ( I ) ⑩.
16
The machine is pre-set at the
For any adjustment, timing
replacement
action
dry steam ;
not
Tabla de contenido
loading

Tabla de contenido