AmazonBasics B073Q48Z95 Manual De Instrucciones página 6

Idiomas disponibles

Idiomas disponibles

Installing Your UPS System
Unpacking
Inspect the UPS upon receipt. The box should contain the following:
(a) UPS unit (b) User's manual
How To Determine The Power Requirements Of Your Equipment
1. Ensure that the equipment plugged into the UPS does not exceed the UPS unit's rated capacity
(400 VA/255 W). If the rated capacities of the unit are exceeded, an overload condition may
occur and cause the UPS unit to shut down or the circuit breaker to trip.
2. There are many factors that can affect the amount of power that your computer system will
require. For optimal system performance, keep the load below 80% of the unit's rated capacity.
Hardware Installation Guide
1. Your new UPS may be used immediately upon receipt. However, after receiving a new UPS,
to ensure the battery's maximum charge capacity, it is recommended that you charge the
battery for at least 8 hours. Your UPS is equipped with an auto-charge feature. When the UPS
is plugged into an AC outlet, the battery will automatically charge whenever the UPS is turned
on or turned off.
2. With the UPS unit turned off and unplugged, connect your equipment requiring battery backup
into the battery power supplied outlets. Plug the other peripheral equipment (printer, scanner,
speakers) into the full-time surge protection outlets. Do not plug a laser printer, paper
shredder, copier, space heater, vacuum, sump pump or other large electrical device into
the "Battery and Surge Protected Outlets". The power demands of these devices will
overload and possibly damage the unit.
3. Plug the UPS into a 2 pole, 3 wire grounded receptacle (wall
outlet). Make sure the wall branch outlet is protected by a fuse or
circuit breaker and does not service equipment with large electrical
demands (e.g. air conditioner, refrigerator, copier, etc...). The
warranty prohibits the use of extension cords, outlet strips, and surge
strips in conjunction with the UPS.
4. Press the power switch to turn the unit on. The Power On indicator will illuminate green and the
unit will "beep" twice.
6
loading