CONTROL PANEL
TANK
TEMPERATURE
CYCLE I
CYCLE II
CYCLE III
36.
START OF SERVICE
•
Open the water supply cock
•
Turn on the main switch
Open the door and make sure the internal components are positioned properly
•
Close the door and press the "on off" button.
•
On the two displays, the message "LOAD" appears with a sound alarm composed of three "beeps". At this point, the
loading cycle starts automatically, on the two displays are displayed alternately: "LOAD" with the basin temperature on
the Lh and that of the boiler on the Rh. the loading cycle ends when the message "LOAD" disappears from the two
displays.
WARNING !! On the pressure boiler models, In the initial filling, the water passes through the boiler to fill the basin, this
takes place continuously until reaching the desired level. This filling takes place with no preheating of the boiler, thus, if
connected to cold water, after the initial filling, the content of the basin will be cold.
RECOMMENDED:
Turn the glass washer 30 minutes prior to use by staff.
•
•
Once the filling cycle is over, make 2 or 3 empty cycles in such a way that the basin temperature adapts
according to the recommended standard (45 - 50°C).
if during this time the door is opened, the two display shows the message " door " at this point the load is interrupted.
The filling and heating phase ends when the display shows that the temperature of the basin and boiler matches the set-
point temperature (factory settings 50°C for the basin and 82°C for the boiler).
pag. 25
COMMAND
LIGHT
BOILER
TEMPERATURE
TANK DRAIN
PARAMETERS CONFIRMATION BUTTON
SWITCH ON - OFF
DOC. W010213 – REV.4
WORKING
HEATING
ELEMENT
INDICATOR