Axis Communications T99A12 Guia De Instalacion página 16

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
AXIS T99A12 Positioning Unit 24 V AC/DC
1
Power cable (not included)
2
I/O cable (optional, not included)
3
Network cable (not included)
4
Cable gasket
5
Transparent base unit cover
8. Fit cable gaskets on the cables. See Cable thickness on page 28.
9. Insert the power, I/O and network cables including the cable gaskets through the holes in
the transparent base unit cover and arrange the cables as shown in the illustration above.
NO TICE
TICE
NO
NO
TICE
If you use both an optical fibre cable and an RJ45 cable for network connectivity, route the
optical fibre cable through the same cable gasket as the I/O cable. Apply a sealant between
the cables and the cable gasket to prevent leakage. For more information on different
network connectivity options, see Install the network link on page 18.
16
loading