Axis Communications T99A12 Guia De Instalacion página 14

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
AXIS T99A12 Positioning Unit 24 V AC/DC
3
Screw hole (x4)
5. For conduit installations only: remove the two conduit cover clips followed by the
conduit cover.
6. Attach the base unit to the mounting surface with appropriate fasteners in the four
screw holes.
Route the cables
WARNING
Risk of electric shock. The product shall be grounded using both the protective grounding
wire in the power cable and the grounding braid. Make sure both ends of the protective
grounding wire and the grounding braid are in contact with their respective grounding
surfaces.
Important
Use only cables that comply with the specified cable area. For more information, see
Cable thickness on page 28.
1
Power cable (not included)
2
Strain relief
3
Grounding screw
4
Grounding braid (not included)
5
Bottom cable hole
14
loading