Probuilder 16620 Manual De Instrucciones página 59

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
Mount to the Wall
STEP 1
GB
Wall Plug
QTY:16 PCS
Plan the placement of the tool cabinet, determine the position of the connecting
hole between the tool board and the upper cabinet, then fix the wall plug.
The feet of the high cabinet and the base cabinet can be raised, and the position of
the wall plug can be a little higher.
STEP 2
Screw M8*18
Flange nut M8
QTY:8 PCS
QTY:4 PCS
Arrange the tall and the upper cabinets in their respective positions, align them,
and connect them in pairs. Riveting nuts have been installed on the side panels
of the drawer cabinet, there is no need to use the nuts when connecting other
cabinets.
STEP 3
Self-tapping screw
M5*15
QTY:8 PCS
Install the benchtop. Screw the self-tapping screws into the benchtop through the
mounting holes on the top of the cabinet, making sure that the benchtop is aligned
with the outside of the base cabinet.
Remove more drawers if necessary, and finally install the drawers back in place.
59
loading