Probuilder 16620 Manual De Instrucciones página 57

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
Cabinet BOX 4
Up
Down
Left side panel
1 PCS
Top Panel
1 PCS
Bottom Panel
1 PCS
Shelf 1 PCS
Back panel
Right side panel
2 PCS
Left door
1 PCS
1 PCS
Please install the base cabinet according to
the tall cabinet assembly instructions.
In step2 and Step3 the side panel and back
panel are connected with bolts and nuts.
Nut M5
QTY:9 PCS
Step10 the shelf can be adjusted at will.
57
Right door
1 PCS
Screw M5*10
QTY:9 PCS
GB
loading