KT 6004
applications such as:
o Reserved kitchen areas for staff in shops, offices and
other working environments.
o Farms.
o By clients in hotels, motels and other residential
environments.
o In environments such hotel room
BEFORE USING
1. Remove all packaging from the pickguard and its power base. Before using the damage for the first time
or if it has not been used for a long time, fill it to the maximum mark and boil it. Then discard that water
and rinse the necessary.
2. Before connecting the appliance to the mains, check that the voltage indicated on the characteristics
plate corresponds to the mains voltage in your home.
INSTRUCTIONS FOR USE
1. Always remove the kettle from the electric base before filling.
2. Raise the lid.
3. Fill the upset with cold water between the MIN and MAX marks on the water level indicator.
4. Close the lid. Make sure the lid is closed properly
5. Place the kettle on the electric base.
6. Plug the power base into the power outlet.
7. To start boiling, push the ON/OFF switch down.
8. The power indicator will light up and the will start working. NEVER REMOVE THE LID DURING THE
BOILING PROCESS.
9. When the water has boiled, the switch will turn on and work automatically. The power indicator will also
turn off.
10. You can stop the boiling process at any time by pressing up on the switch.
11. After the overflow automatically shuts off, there may be a short delay before you can boil again. This is
usually no more than 20 seconds.
12. The safety switch will be activated if you accidentally turn on the thermostat when it is empty or let it
run dry. Wait 15 minutes for the switch to reset before refilling with cold water and boiling.
10