Qlima PGU 2013 Instrucciones De Uso página 45

Ocultar thumbs Ver también para PGU 2013:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
man_PGU2013 ('20).indd 45
man_PGU2013 ('20).indd 45
ASSEMBLY (picture 2)
Required tools
Open end wrench 10 & 13 mm
Adjustable opening wrench (2) 20 cm (8'') long
Slip joint pliers 23 cm (9'') long
Philips screwdriver w/ medium blade
PIumbing tape for joints
Spray bottle of soap solution for leakage test
Parts supplied
Stand (1) with tank housing (8)
Assembly post (7) with 3 pcs post brackets
Gas connector suitable for:
- Ø 8-12 mm hose (all EU countries except France)
- G1/2'' (France only)
Note: Hose and regulator not included
Reflector 820 mm consisting out of 4 pieces with:
- 9 pcs washers Ø 8 mm
- 9 pcs M6*10mm bolts
- 9 pcs M8 cap nuts
3 pcs 60 mm pins for reflector support
4 pcs bolts M6 X 10 mm for assembly post and burner
6 pcs bolts & nuts M6 X 35 mm for post and post brackets
3 pcs bolts M8 X 16 mm for post brackets and stand
Bracket with 2 wheels including:
- 2 bolts M8*20
- 2 nuts M8
Step 1a: picture 12
To protect heater from strong wind, anchor the base securely to the ground with
screws.
Reverse the base, fix the ground fixer to the base with bolts and washers like
picture shows.
Secure the ground fixer with nuts.
Fix another two ground fixer with bolts and nuts, and reverse the base.
Step 1b: picture 3
Put the 3 pcs post brackets (9) on each position on the base (10) as shown in
picture 2.
Use 3 pcs M8 x 16 mm bolts to join the post brackets (9) and base (10).
Step 2: picture 4
Put the post (7) on the top of 3 pcs post brackets (9).
Use 6 pcs M6 x 35 mm bolts and nuts to connect the post (7) to the 3 pcs post
brackets (9). Tighten the bolts and nuts.
Step 3: picture 5
Step 4: picture 6, 7, 8
Secure the 3 pcs 60 mm pins (reflector support bolts) on the cap of flame
screen (2).
Connect the gas hose (QA1) to the gas connector. (picture 7)
4
45
18-05-20 12:49
18-05-20 12:49
Tabla de contenido
loading

Tabla de contenido