IMPORTANT ASSEMBLY STEPS
EN
When encountering this information icon during assembly, please refer the relevant assembly step for important additional comments.
WING PARKING:
Step 1:
Dig two (2) holes according to the specified measurements and make sure the bottom
is well tightened.
Plan ahead according to the placement of the parking as shown in the drawing.
Make sure the pits' walls are at a 90°.
If the ground is sandy and digging proper holes is impossible, please consult a local
expert / constructor.
Step 2:
Please use wooden beams (not supplied) to set and hold the aluminum poles in place, make
sure the profiles are set at a depth of 19.6" (50 cm) in accordance with step #4 in the Arizona
Wave/Breeze assembly instructions. The aluminum poles must be leveled in all directions.
* Carry out steps 1-4 in the Arizona Wave / Breeze assembly instructions, prior to carrying
out this step.
Step 3:
Please note and make sure the concrete casting reaches the line that was marked on the
profile at the previous steps.
* Please wait for the concrete to be fully set and dry, in accordance with the manufacturer's
instructions and depending on the weather conditions, before continuing with the assembly!
Step 4:
Carry out steps 7-8 in the Arizona Wave / Breeze assembly instructions, prior to carrying
out this step. Please note the profile's direction.
Step 5:
Carry out steps 10-17 in the Arizona Wave / Breeze assembly instructions, prior to
carrying out this step.
Step 6:
Carry out steps 18-19 in the Arizona Wave / Breeze assembly instructions, prior to
carrying out this step.
Step 7:
Carry out steps 20-32 in the Arizona Wave / Breeze assembly instructions, prior to
carrying out this step.
For Arizona Breeze - WINGS: After this step, proceed with Arizona Breeze assembly
instructions.
Step 8:
Carry out steps 20-25 in the Arizona Wave assembly instructions, prior to carrying out this step.
Step 9:
Carry out steps 27-29 in the Arizona Wave assembly instructions, prior to carrying out this step.
Step 10:
Lay out all the panels and make sure they overlap, move one set of panels at a time in
order to connect them to the roof with the supplied screws. After this step, proceed
with Arizona Wave assembly instructions.
ARCH PARKING:
Step 11:
Dig (4) holes according to the specified measurements and make sure the bottom is
well tightened.
Plan ahead according to the placement of the parking as shown in the drawing.
Make sure the pits' walls are at a 90°.
If the ground is sandy and digging proper holes is impossible, please consult a local
expert / constructor.
Step 12:
Please use wooden beams (not supplied) to set and hold the aluminum poles in place, make
sure the profiles are set at a depth of 19.6" (50 cm) in accordance with step #4 in the Arizona
Wave/Breeze assembly instructions.
The aluminum poles must be leveled in all directions.
Step 14:
lease note and make sure the concrete casting reaches the line that was marked
on the profile at the previous steps.
* Please wait for the concrete to be fully set and dry, in accordance with the manufacturer's
instructions and depending on the weather conditions, before continuing with the assembly!
Step 15:
Carry out steps 7-25 in the Arizona Breeze assembly instructions, prior to carrying
out this step.
Step 17:
Carry out step 32 in the Arizona Breeze assembly instructions, prior to carrying out this step.
Step 23:
In order to be able to insert the sealing strips, perform gradually: panel + sealing strip.
Step 25:
After this step, proceed with Arizona Breeze assembly instructions.
Step 26:
Carry out steps 7-24 in the Arizona Wave assembly instructions, prior to carrying out this step.
Step 30:
Carry out steps 27-29 in the Arizona Breeze assembly instructions, prior to carrying out this step.
Step 31:
Lay out all the panels and make sure they overlap, move one set of panels at a time in order
to connect them to the roof with the supplied screws. After this step, proceed with Arizona
Wave assembly instructions.