Health O Meter Professional 500KL Manual De Instrucciones página 9

Ocultar thumbs Ver también para Professional 500KL:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS (CONTINUED)
5. Remove the black wheel
cover from the packaging.
Read the "Attention" label
then remove it from the
bracket. Place the cover back
onto the platform.
6. Obtain the scale pillar and
locate the load cell cable.
Place the pillar above the
platform and cover with the
display head facing the scale
platform. Carefully pull the
cable connector from the
bottom of Column B and plug
into the RJ jack on scale
platform C. Once plugged in
completely, lower the pillar
into the cover.
Alternate Method of Plugging in the
Load Cell Cable:
If having difficulty plugging the cable
into the port, complete step 7 then
you may also access the load cell
cable via the door on the rear of the
cover. Use a Phillips screwdriver to
remove the door at the back of the
platform base then plug in the load
cell cable and replace the door.
7. Keep a firm hold on the pillar
and platform and place the
scale on its side. Locate the 4
column mounting screws
previously removed in step 2.
Ensure that washers are
located between the screw
heads and the scale platform
C screw holes. Insert the 4
screws through the bottom of
scale platform C screw holes
and into Column B. Using a
Phillips head screwdriver,
tighten the screws to secure
Column B to the base of
platform C.
P/N UM500KL 500KG REV20211008_REV20210128
Alternate method to plug cable into port:
9
Back to Home Page
Tabla de contenido
loading

Tabla de contenido