Nominal
RG-
bonnet/
diameter
RG-body
[Nm]
DN 10
DN 15
DN 20
DN 25
DN 32
DN 40
DN 50
6
Operation
6.1
Prior to start-up
Check the following points prior to start-up:
All mounting and installation work are completed.
If fitted: The blocking bushing was removed prior to start-up.
The safety guards are in place.
Compare the material, pressure, temperature and installation position with the layout plan for
the pipework system.
Contamination and residues have been removed from the pipeline and valve to prevent
leaks.
24
Operating instructions
RG-
SS-
bonnet/
bonnet/
SS-
SS-body
body
[Nm]
[Nm]
19
19
30
19
19
30
37
44
50
37
44
50
41
45
50
51
60
70
49
50
50
Phone +49 4531 509-0
Assembly sequence for the screws
Cylinder
bolt
Bonnet / body tightening torques
RG-bonnet ≙ gunmetal bonnet
M8
RG-body ≙ gunmetal body
M8
SS-bonnet ≙ stainless steel bonnet
SS-body ≙ stainless steel body
M10
M10
M10
M12
M10
Check the leak-tightness