Operation; Prior To Start-Up - HEROSE 01312 Instrucciones De Servicio

Válvulas de compuerta para bajas temperaturas - forma ángulo
Ocultar thumbs Ver también para 01312:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
Nominal
RG-
bonnet/
diameter
RG-body
[Nm]
DN 10
DN 15
DN 20
DN 25
DN 32
DN 40
DN 50
6

Operation

6.1

Prior to start-up

Check the following points prior to start-up:
All mounting and installation work are completed.
If fitted: The blocking bushing was removed prior to start-up.
The safety guards are in place.
Compare the material, pressure, temperature and installation position with the layout plan for
the pipework system.
Contamination and residues have been removed from the pipeline and valve to prevent
leaks.
24
Operating instructions
RG-
SS-
bonnet/
bonnet/
SS-
SS-body
body
[Nm]
[Nm]
19
19
30
19
19
30
37
44
50
37
44
50
41
45
50
51
60
70
49
50
50
Phone +49 4531 509-0
Assembly sequence for the screws
Cylinder
bolt
Bonnet / body tightening torques
RG-bonnet ≙ gunmetal bonnet
M8
RG-body ≙ gunmetal body
M8
SS-bonnet ≙ stainless steel bonnet
SS-body ≙ stainless steel body
M10
M10
M10
M12
M10
Check the leak-tightness
Tabla de contenido
loading

Este manual también es adecuado para:

0132201332013420134601352

Tabla de contenido