SUPAIR SHINE Manual De Usuario página 32

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SHINE reserve parachute's manual SHINE
The reserve parachute installation will vary relative to the riser type used. Please review the following recommendations :
- « Y » risers setup. >>Two (2) 6mm Maillons Rapides® are needed ( Ref. : MAILCARIN6 ) + two (2) toric elastic rings ( Ref. : MPPP044 ).
- Separate STD risers ( Ref. : ELESOLOSTD ). >> One (1) square 7mm Maillon Rapide® will be needed ( Ref. : MAILCARIN7 ) + four (4) flexible toric rings (
Ref. : MPPP044 ).
Follow the instructions corresponding to the type of risers you intend to use.
1. Reserve parachute to harness connection with « Y » risers.
>> « Y » riser reserve parachute connection.
Make a loop to loop ( Lark's head ) knot between the single reserve parachute riser and the base of the « Y » riser where the
bigger bridle diameter loop is located.
>> « Y » riser connection to the harness.
1.
- Take two (2) square 6mm Maillons Rapides® and two (2) flexible toric rings.
- Unfasten the Velcros (or zip) located alongside the shoulder protective sleeves to reach the reserve parachute connection
loops on the shoulder straps.
2.
- Open the Maillon Rapide®- Push
the bridle's buckle through.
- Push the maillon through the flex-
ible toric ring.
- Twist
7.
Tuck away the risers excess ( without making knots ) under one
6.
Repeat sequence
single flap :
1 through 5 on the
other side of the
- Either to the right side if you wish to place your reserve parachute
harness.
handle to the right ( recommended if right handed ).
- Or to the left side if you wish to place your reserve parachute
handle to the left ( recommended if left handed )..
- Close the protective sleeves Velcros (or zip).
Connecting the reserve parachute to the harness
3.
- Push the riser's loop
through the flexible toric ring.
- Push the maillon through the
riser's loop.
4.
- Give a second twist to the
toric ring.
- Push the Maillon Rapide®
through the riser loop.
5.
-
Tidy up the assembly.
- Be certain that the risers end loops
are securely in place.
- Close the maillon tightly by hand.
- Complete tightening with pliers by
making a ¼ tightening turn.
SUP'AIR
_SHINE
Page 10
Tabla de contenido
loading

Tabla de contenido