Planning E120 Positioning And Back Box Locations - QAcoustics E120 Guia De Instalacion

Ocultar thumbs Ver también para E120:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36

Planning E120 positioning and back box locations

Use the guidelines below to plan the positioning of the back boxes, speakers, and cabling. Dimensions
should be checked prior to installation to ensure the layout works correctly with the supplied lengths
of cable.
If more than 7m of speaker cable is required then a suitable alternative such as QED 16/2 can be
purchased and cut to length.
Cut-outs for left and right ceiling speakers
Follow installation instructions supplied with speakers
7m maximum cable run from
speakers to E120 touch panel
using supplied cables
IMPORTANT DIMENSION
E120 must be located within
reach of a mains socket. The
supplied DC cable is 5m long
and should not be altered.
Double gang
back box for
E120 touch
panel
47mm deep
Mains
socket
Single gang back box
for DC cable breakout
44mm deep (not supplied)
Optional single gang back
box next to TV point
44mm deep (not supplied)
7
TV
Tabla de contenido
loading

Este manual también es adecuado para:

Qi0120Qi0122

Tabla de contenido