CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To get maximum output 4.6 mbar measured on the pipe coupling is necessary with combustion
chamber at 0 mbar and gas G20 - Pci = 10 kWh/m
6
5
4
3
2
1
0
10
10,000
GAS FEEDING LINE
1
1
– Gas arrival pipe
2
– Manual gate
(supplied by the installer)
3
– Gas pressure gauge
4
– Filter
5
– Gas pressure switch
6
– Safety valve
7
– Pressure governor
GAS TRAIN ACCORDING TO EN 676
MULTIBLOC
MBZRDLE 405 B01
The gas train is supplied separately, for its adjustment see the enclosed instructions.
3312
20
30
20,000
30,000
2
3
M1
(supplied by the installer)
CONNECTIONS
TRAIN
Rp 1/2
3
(8,570 kcal/m
3
).
40
50
40,000
Output
4
5
6
7
st
8
– 1
and 2
M1 – Gas-supply pressure test point
M2 – Pressure coupling test point
BURNER
Rp 1/2
4
GB
60
kW
50,000
kcal/h
D5058
8
M2
nd
stage adjustment valve
USE
Natural gas and LPG
D5072