4.INSTALATION
The installation of the Green Wall is easy to do.
1) Think about what the location and what kind of plants will be planted. Remember that plants
that require lots of sun should be planted on a south facing wall.
2) Determine the number of panels to be installed.
What employer wants to create?
Remember to interconnect the water supply line must unite each module together by
quick-connect links.
3) Once you have determined where the first panel will be located, keep it against the wall to
mark the holes (use a spirit level). It is very important that you use a level if you are adding
more panels, because a small error can divert level line panels. Also the drain pan will overflow
if not horizontally.
Then we have to mark the wall to place the cradle of stainless steel.
You can find the three pilot holes identified with small "flower petals" around the edge that is in
a line down the center of the panel.
You can use a sharpened screwdriver or a drill to make the holes for the support. Then you can
remove the wall panel and the stainless steel as guide, marking a third center hole to provide
additional strength to the entire unit.