Cable Management - Humanscale M/FLEX Instrucciones De Montaje

Ocultar thumbs Ver también para M/FLEX:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10

Cable Management

1
Route power and monitor cables through the
flexible Cable Clips (A) on the Upper Link.
2
Slide the Cover (B) off of the Straight Link.
3
Route cables into the Straight Link and
replace the Cover, sliding until it clicks into place.
4
Route cables through Cable Routing Hook (C).
CAUTION: Don't insert extension cords. Don't insert
any cord connecting one workstation to another.
Adding A Second Row Of Monitors
1
Remove Cap from the top of the first Post.
2
Install the Coupling Screw (A) into the top of
Post. Leave half of the Screw sticking out.
3
Screw second Post onto the Coupling Screw.
Posts must be tightly seated against each other.
4
Push Cap on top of second Post.
CAUTION: Do not install a Post, or a combination
of Posts, that exceed 24" (610 mm) in height.
6
B
A
C
A
Tabla de contenido
loading

Este manual también es adecuado para:

M/connect 2M/power

Tabla de contenido