Cable Management
1
Route power and monitor cables through the
flexible cable clips on the M8.1's upper link
(A).
NOTE: Leave enough slack in the cables to allow
arms to rotate without difficulty.
2
Slide the plastic cover (B) on the lower link
upward to remove.
3
Using the two cutouts (C) as guides, run the
cables over the lower link cover.
4
Lift the cover and cables up to the lower link,
making sure that the cover sits flush with the
surface of the arm.
5
Slide the cover down the arm to lock in place,
then gently pull the cables through the arm to
remove excess slack.
CAUTION: Don't insert extension cords. Don't
insert any cord connecting one workstation to
another.
①
②
③
④
⑤
A
B
C
7