K2 Pumps WPD07502K Manual Del Propietário página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Connect 1-1/4in. Drive Coupling to
point.Thread 1-1/4in.Galv.Steel Pipe into
Coupling.
(Fig. 1)
3. Install 1-1/4in.PVC TEE FPT×FPT×FPT to the nipple.
One end of horizontal port install another 1-1/4in. PVC
MPT×S Male Adapter and 1-1/4 in.PVC rigid
Pipe.Add sections of pipes to reach the 1-1/4in. PVC
Slip ×Slip Union (optional). (Fig. 3)
For Surface water Installation
1. Connect 1-1/4in.Brass Foot Valve to 1-1/4in. PVC
MPT×S Male Adapter.Cement adapter to 1-1/4 in.
PVC rigid Pipe. All connections must be air- and
water-tight for pump to operate correctly. (Fig 1)
3. Cement 1-1/4in. PVC MPT×S Male Adapter into
1-1/4 in. PVC rigid Pipe. Install 1-1/4in.PVC TEE
FPT×FPT×FPT to adapter. One end of horizontal port
install another 1-1/4in. PVC MPT×S Male Adapter
and 1-1/4 in.PVC rigid Pipe. Add sections of pipes to
reach the 1-1/4in. PVC Slip ×Slip Union
(optional ).(Fig. 3)
For Professional Technical Support call 1-844-242-2475
Thread
well
2.
Drive
Steel nipple .Install 1-1/4in. × 3in. Galv. Steel Nipple
into the check valve. (For easy priming connect the
check valve as close to the well as possible) (Fig. 2)
2. Install screen surround the foot valve, protect the foot
valve assembly from fish, trash, etc. Position the foot
valve 5 feet above bottom of well and It should also be
at least 10 feet below the water level in order to
prevent the pump from sucking air. (Fig 2)
1-1/4 in. Lead Free Brass Check Valve into
7
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Wpd07501kWpd10001k

Tabla de contenido