4. HOW TO USE
1. Place the lifting tower over a firm and flat
surface in its working place.
2. Remove the outriggers (H) from their
transport supports (C) and insert them into
their working positions (G) hecking that
they are fixed by the safety pins (K).
3. Adjust the outrigger stabilisers (J) by tur-
ning the cranks (I) to level the lifting tower.
Ensure it is in a vertical position checking the
bubble level.
4. Put the load on top of the lifting tower
using the suitable support, in order to make
work the weight of the load only in vertical
direction. The minimum load must be 25kg.
It is possible to manually block it with the
safety pins (A).
5. Elevation: Turn the winch handle (B) cloc-
kwise to lift the load until the wished posi-
tion, checking that safety pins (A) are activa-
ted (T).
6. Lowering: release the safety pins (A) doing
the action U. To release them, turn slightly
the winch handle to elevate the load. In the
normal working position, the load's weight
does not allow to release the safety pins.
S
T
U
A
B
I
J
H
K
C
G
Once the safety pin (A) is unblocked, turn the
winch handle (B) opposite clockwise until
lowering the load and the first profile is com-
pletely down. Release the safety pins (A) and
keep on lowering the lifting tower until the
second profile is completely down. Unblock
the safety pin (A) and continue lowering the
lifting tower until it is completely folded as
its minimum height. The lifting tower can be
fixed in any needed intermediate position as
well as when raising the load, fixing the safety
pin (A) in the position (S).
7. For the lifting towers' transport is neces-
sary to bring down all the profiles, releasing
the safety pin (A) doing the action U. To fix
the profiles with the safety pins (A) in the po-
sition (S).
5. MAINTENANCE
1. Periodically check cable status. If the cable
seems to have broken cable wires or crushing,
replace immediately with a new one. Never
use the lifting tower with cables in bad con-
ditions. Only use galvanized steel under EN
12385-4. Cable maximum load: 956kg. Cable
torsion resistance: 1.770 N/mm². Cable dia-
meter: 4mm. Cable composition: 7x19+0.
2. The lifting tower is supplied fully greased
from factory. Nevertheless, periodical grea-
sing is recommended as per use to the crown
gear of the winch, to the threaded bar of the
stabiliser outriggers and the profiles too.
WARNING:
DO NOT GREASE OR LUBRICATE BRA-
KING MECHANISM
Braking disks were greased with a special
heat and pressure resistant grease. No other
product must used to prevent negative in-
fluence on brake functioning.
3. Lifting tower MEGARA 125, must be
checked by an expert once a year minimum
as per its use.
4. Only original spare parts must be used to
ensure continued safe use. The user loses all
guarantee rights if spare parts other than the
originals are incorporated or modifies the
product in any way.
5. To request any spare part, contact the
manufacturer or an authorised distributor
within your territory.
www.audiovias.com
ENGLISH
13 13