ENGLISH
4. HOW TO USE
1. Place the lifting tower over a firm and flat
surface on its working place.
2. Remove the outriggers (H) from their
transport supports (C) and insert them into
their working positions (G) checking that
they are fixed by the safety pins (K).
3. Adjust the outrigger stabilisers (J) by tur-
ning the cranks (I) to level the lifting tower.
Ensure it is in a vertical position checking the
bubble level.
4. Put the load on top of the lifting tower
using the suitable support, in order to make
work the weight of the load only in vertical
direction. The minimum load must be 25kg.
It is possible to manually block it with the
safety pins (A).
5. Raising: release the safety pins (A) in its
position (T). To release them, turn slightly
the winch handle to elevate the load. In the
normal working position, the load's weight
does not allow to release the safety pins.
Once the safety pin (A) is unblocked, turn
the winch handle (B) anticlockwise until the
load is lowered and the first profile is com-
pletely down. Release the safety pins (A) and
keep on lowering the lifting tower until the
second
Fig. 1
S
T
14 14
A
B
I
J
H
K
C
G
profile is completely down. Unblock the sa-
fety pin (A) and continue lowering the lifting
tower until it is completely folded at its mi-
nimum height. The lifting tower can be fixed
in any needed intermediate position as well
as when raising the load, fixing the safety pin
(A) in the position (S).
6. Lowering: release the safety pins (A) in its
position (T). To release them, turn slightly
the winch handle to elevate the load. In the
normal working position, the load's weight
does not allow to release the safety pins.
Once the safety pin (A) is unblocked, turn
the winch handle (B) anticlockwise until the
load is lowered and the first profile is com-
pletely down. Release the safety pins (A) and
keep on lowering the lifting tower until the
second profile is completely down. Unblock
the safety pin (A) and continue lowering the
lifting tower until it is completely folded at
its minimum height. The lifting tower can be
fixed in any needed intermediate position as
well as when raising the load, fixing the safety
pin (A) in the position (S).
7. For the lifting towers' transport it is neces-
sary to bring down all the profiles, releasing
the safety pin (A) doing the step (T). Fix the
profiles with the safety pins (A) in position
(S).
www.audiovias.com