Preparing The Opening - GE CP650 Instrucciones De Instalación

Ocultar thumbs Ver también para CP650:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PREPARINg THE OPENINg

1
The following MINIMUM clearance dimensions
must be maintained.
13" MAX. Depth of uprotected
overhead cabinets
30" MIN.
Clearance from
countertop to
unprotected
overhead
surface
2" MIN. Clearance
from cutout to side
wall on the left of
the unit
If a 30" clearance between the cooking surface
and overhead combustible materials or metal
cabinets cannot be maintained, a minimum
clearance of 24" is required and the underside
of the cabinets above the cooktop must be
protected with not less than 1/4" insulating
millboard covered with sheet metal not less than
0.0122" thick.
2 OVERALL COOKTOP DIMENSIONS
36"
(36-1/8" SS)
Cooktop
18-7/8"
3
Five inches (5")
minimum vertical
clearance between
the cooktop bottom
and any combustible
surfaces.
Installation Instructions
2" MIN. Clearance
from cutout to
side wall on the
right of the unit
15" MIN. Height
from countertop to
nearest cabinet on
either side of unit
20-7/8" (21" SS)
Depth on Monogram ZEU36K
is 21-1/4' @ center.
3-1/4" Front
4-5/8" Rear
at the conduit
location
6-1/4" Rear
33-3/4"
on Model PP975 &
PP980
5" Min.
Vertical Clearance
4 CUTOUT DIMENSIONS Of THE
COUNTERTOP
To insure accuracy, it is best to make a template
when cutting the opening in the counter.
1-3/4" Min. Between
cutout and the wall
behind the cooktop
2-1/2" Min.
from front edge
of cutout and
front edge of
countertop
5
Make sure the wall coverings, countertop and
cabinets around the cooktop can withstand
heat (up to 200°F) generated by cooktop.
Wall covering,
cabinets and
countertop must
withstand heat up
to 200°F.
4
19-1/8" width of cut
33-7/8"
length of
cut
Tabla de contenido
loading

Este manual también es adecuado para:

Jp655Pp962Pp972Pp975Pp980Zeu36k