Prepare The Site - Kohler ABRAZO K-1800 Manual De Instalación

Ocultar thumbs Ver también para ABRAZO K-1800:
Tabla de contenido
Finished Floor

1. Prepare the Site

NOTICE: Provide adequate floor support.
NOTICE: Measure your product for site preparation. Visit the product page at www.kohler.com for more
information.
Determine the location of the bath.
Make sure the subfloor offers adequate support for your bath.
Ensure the subfloor is level.
IMPORTANT! To ensure a successful installation, it is critical that you install the bath on a level finished
floor.
Install the finished floor material.
Make sure the finished floor is level before proceeding.
Position and install a standard PVC or brass bath drain pipe. Install the drain pipe so it extends
2-1/8" (54 mm) above the finished floor.
Kohler Co.
Drain
Pipe
3
2-1/8"
(54 mm)
1207308-2-A
Tabla de contenido
loading

Tabla de contenido