How To Install; Unpacking The Air Conditioner; Preparing The Air Conditioner - Haier ESAQ406T Guía De Uso Y Cuidado

Ocultar thumbs Ver también para ESAQ406T:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

UNPACKING THE AIR CONDITIONER

When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
REMOVE PACKAGING MATERIALS
• Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE: There are NO internal packing materials inside the air conditioner to remove―Do Not
open the cabinet.
• Handle the air conditioner gently.
• Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
• The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

INSTALL TOP CHANNEL
3/8" Screw
(Actual Size)
1. Place the top channel on the top of the air conditioner, lining up
the holes in the top channel with the holes in the top of the unit.
Make sure the channel is facing forward as indicated by the
illustrations. (See Fig.7 & 8)
2. Using 3/8" self-tapping screws, attach the top channel to the top
of the air conditioner. (See Fig.8)
Use four (4) 3/8" self-tapping screws for models:
ESAQ406T HWQ08XCT
PAGE 10
WARNING
EXCESSIVE WEIGHT HAZARD
possible sharp edges and metal fins.
Front
Top Channel

HOW TO INSTALL

Fig. 7
Fig. 8
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hwq08xct

Tabla de contenido