5. Final Inspection
GB
CHECK
1
2
3
4
5
6
7
8
9
10
11
•
Check all safety devices of the door and if necessary readjust them.
•
Check all door functions against the checklist and sign off the completed list.
•
Fill out the CE declaration of conformity. Deliver the door to the customer in accordance with
CE directives. (The CE Declaration can be found in the user manual as an appendix.)
Checklist
Location of the door:
1
Door plate
1.
Condition of door panel
2.
Attachment to door roller
3.
Attachment to bottom beam
4.
Welds in door panel
5.
Mounting clamp blocks
2
Bottom beam
6.
Guides
7.
Floor rubber
8.
Break-Away *
3
Guide rail
9.
Column attachment
10. Console attachments
11. Dents / scratches
16
Conformity
1
2
3
4
5
6
7
8
9
10
11
Commissioned on:
4
approved
Drive
12. Attachment
13. Leaks
14. Motor brake
15. Adjustment limit switches
5
Tensioning and
balancing system *
approved
16. Tension belt / elastic
17. Fastening tension belt / elastic
18. Return pulleys
19. Roll-up disks
20. Tension spring *
approved
21. Buckle loops
22. Buckle tightened
6
Control box
23. Push buttons on the box
24. Stop switch
25. General cabling
7
Controls
26. Push buttons*
27. Pull switch*
28. Photocell + reflector *
29. Radar *
30. Induction loop *
31. Receiver *
32. Hand-held transmitter *
33. Key switch *
Declaration from engineer and/or installation firm
We declare that we have complied
withthe manufacturer's
instructions in accordance with
eN13241-1 Commercial
door systems product norm
attachment IIA.
approved
Installation company:
Street and property number:
approved
Postcode / Place:
Phone / fax:
8
approved
Security
34. Safety photocell *
35. Safety edge protection *
36. Light screen *
37. Iris *
approved
9
Hood *
38. Attachment
39. Seal tightness
10
Miscellaneous
40. Maintenance sticker
41. Type plate
* if applicable
Company stamp
Place of delivery:
Date:
Name of engineer:
Signature of engineer:
approved
GB
approved
approved
17