Installation Sleeve Setup - Iluminarc Ilumipod Inground Tri-12 Optic IP WW Guía De Referencia Rápida

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Ilumipod Inground Tri-12 IP Optic WW QRG
EN
Installation
When setting up the installation sleeve, make sure that any water that may
have entered it can drain out of the sleeve on its own. Locate the installation
Sleeve Setup
sleeve above the normal drainage level so the fixture does not become
submerged in more than 1 m of water during heavy rain.
In addition, make sure that the installation sleeve allows the stainless steel
collar to be level and flush with the ground surface to distribute the load
uniformly over the fixture's surface.
Collar
Concrete
Installation Sleeve
Drainage
Drainpipe
Hardpan
The Ilumipod Inground Tri-12 IP Optic WW can support a distributed load
of up to 3,000 kg (6,614 lbs) when properly installed.
6
Tabla de contenido
loading

Tabla de contenido