EN
Installation
Notes
Installation
Sleeve
Orientation
Ilumipod Inground Tri-12 IP Optic WW QRG
The Ilumipod Inground Tri-12 IP Optic WW consists of two parts, the
fixture housing and the concrete installation sleeve. The fixture housing is
IP67 rated, but the sleeve is intended to allow drainage. Read the
installation instructions carefully for the concrete installation sleeve
regarding leveling and drainage.
Run the AC power and signal cables into the concrete installation sleeve
and the fixture's housing. Do not use the fixture's junction box to extend
the power or signal cables to other units because this may compromise the
IP rating of the junction box. Instead, use individual cables from the fixture
to the corresponding distribution boxes.
Always keep the power cables away from the signal cables by running them
in different conduits and using separated distribution boxes.
This product is intended for installation into concrete or other hard pan
substrate. It is not intended for installation into soft substrates including, but
not limited to, soil or mulch.
Orient the installation sleeve to allow the signal cable to enter the sleeve
using one of the four cable inlets and the power cable to use the opposite
inlet, as seen in the figure. This will reduce the stress to the signal and
power cables when installing the fixture, while keeping them separated.
Power Cable
To Power
Distribution
Box
5
Signal Cable
To Signal
Distribution
Box