Fanimation SHOWROOM Serie Manual Del Usuario página 8

Ocultar thumbs Ver también para SHOWROOM Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan (Continued)
5. Route wires and safety cable through motor
coupling cover, canopy screw cover and ceiling
canopy. (Figure 5)
6. Reinstall the hanger ball on the downrod as follows.
Route the black, white, blue wires and safety cable
through the hanger ball. Position the pin through the
two holes in the downrod and align the hanger ball so
the pin is captured in the groove in the top of the
hanger ball. Pull the hanger ball up tight against the
pin. Securely tighten the set screw in the hanger ball.
A loose set screw could cause fan wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
NOTE: All set screws must be checked, and
retightened where necessary before installation.
8. Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
Ceiling
Canopy
Motor Coupling
Cover
Hanger Bracket
8
Canopy Screw
Cover
Figure 5
Figure 6
Figure 7
Figure 8

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Showroom kwad 52

Tabla de contenido