Grohe Grandera 19 940 Manual Del Usaurio página 8

Idiomas disponibles

Idiomas disponibles

Installation Type #3
1. Install control unit and secure with screws, see Fig. [5].
2. Open the hot and cold integrated service stops, see Fig. [6].
3. While installation observe the right mounting position.
4. For installation of handle parts after adjustment, see Fig. [7].
Adjustment
Temperature setting, see Fig. [8].
• Before the mixer is put into service, if the mixed water
temperature measured at the point of discharge varies from
the specified temperature set on the thermostat handle.
• After any maintenance operation on the thermostatic
cartridge.
5
7
5
English
One or more separate volume control (D) (not supplied) are
required to control the water flow, see Fig. [8].
Open volume control by turning the lever (D), see Fig. [8].
1. Measure the temperature of the water emerging with a
thermometer.
2. Turn regulation nut (C) until the water emerging has reached
a temperature of 38 °C or 100 °F.
Reversed union (hot on right - cold on left). Replace
thermostatic cartridge, special cartridge for service is:
Ref. No.: 47 186 (3/4") (see Page II).
6
8
38 °C
100 °F
C
D
loading

Este manual también es adecuado para:

Grandera 19 935Grandera 19 947