Dyna-Glo WORKHORSE Serie Manual De Usuario E Instrucciones De Funcionamiento página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

NEVER LEAVE THE HEATER
UNATTENDED WHILE BURNING!
2. ASSEMBLY
For
KFA50WH/80WH
(Assembly time for this product is 3 minutes)
Tools Required
• Medium Phillips Screwdriver.
1) Lift front guard for arrow direction and make
sure that guard's wedged portion fits into the slit
hole on the upper housing.
2) Remove the pre-assembled screws on the shell
upper.
3) Align the holes in the upper housing with two
mounting holes on the handle as shown in
Figure 6.
4) Secure handle with the screws removed.
For
KFA135WH/180WH/220WH
Tools Required
• Medium Phillips Screwdriver.
• 3/4 inch socket or adjustable wrench
Assembling Handle & Wheel and Cord Wrap
1) Slide threaded axle through the rear section of the wheel support frame.
2) Slide one axle bushing on to each side of the axle. Slide one wheel on to each side of the axle.
Attach one cap nut on to each side of the threaded axle and tighten well.
3) Place heater on wheel support frame. Align the holes on fuel tank flange with holes on wheel support frame.
4) Position the Handles on top of fuel tank flange.
Insert screws through handles, fuel tank flange and wheel support frames as shown in Figure 8 and
attach nut finger tight after each screw is inserted.
5) Align the hole on the handles with the mounting hole on the Cord Wrap.
Insert Screws through Cord Wrap, handles and attach nut finger tight after each screw is inserted.
6) After all screws are inserted, tighten nuts firmly.
Models only
Models only (Assembly time for this product is 10 minutes)
Screw
Handle
Remove
Screws
Figure 6. Assembling Handle
5
Front Guard
Wedged Portion
Slit Hole
Shell Upper

Capítulos

Tabla de contenido
loading

Tabla de contenido