Installation Instructions
ductwork locations.
of the unit into the plenum until it is fully seated.
(Unit touches air divider)
Install the Wall Plenum
proper installation procedures.
Build and Install the Zoneline Base Platform
1. Construct a 23-
Recommended platform height:
below wall plenum opening. See
details
2. Place the platform in the utility closet with the following clearance between it and the interior surface of the
walls/door/panel:
3. Align the platform with the opening of the wall plenum and secure to the floor using appropriate brackets
and bolts.
Condensate Disposal System
condensate onto the hot outdoor coil.
NOTE: If the Condensate Disposal System fails to remove all of the condensate from the unit, any
excess condensate will overflow from a spillway in the rear of the unit directly into the wall plenum,
and drain outside the building. This is your indication that the chassis or drain requires servicing.
INSTALLATION SEQUENCE
INSTALLATION INSTRUCTIONS
23-
min.
7.
Connect unit to the ductwork.
8.
Connect the thermostat.
Install the Grille
in the grille kit RAVAL2 for proper installation
procedures.
23-
min.
49-5000431 Rev. 1