Fanimation LP8147SLBN Manual Del Usuario página 8

Ocultar thumbs Ver también para LP8147SLBN:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan (continued)
6. Reinstall the hanger ball on the downrod as follows.
Route the brown, blue, red, gray and yellow wires
through the hanger ball. Position the pin through the
two holes in the downrod and align the hanger ball so
the pin is captured in the groove in the top of the
hanger ball. Pull the hanger ball up tight against the
pin. Securely tighten the set screw in the hanger ball.
A loose set screw could create fan wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
CAUTION
All set screws must be checked, and retightened where
necessary before installation.
8. Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
8
Figure 6
Figure 7
Figure 8

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Lp8147slbl05815980795392

Tabla de contenido