Electrical Connection; Product Description; Before Using For The First Time - HAEGER RE-90W.015A Manual De Instrucciones

Frigorífico table top
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

English
Take care not to scratch or damage the floor when installing the appliance on parquet or
linoleum. If necessary, when positioning slide the refrigerator over pieces of wood or a mat
to the point decided for connection to the electrical mains.
Positioning and levelling the appliance
Place the refrigerator on a stable and level floor. In case the floor is not perfectly level, use the
two adjustable feet on the front part of the fridge. To ensure major stability, easier movement
and a correct positioning of the product, two additional wheels are present at the rear. In any
case we recommend moving the fridge very carefully in order to avoid floor damage (especially
in case of wooden floor).

Electrical connection

Before switching the refrigerator on for the first time, leave it vertical for at least two hours.
Then connect the appliance's power supply lead to a mains socket with earth contact, installed
in accordance with electrical safety regulations. The rated voltage and frequency are stated on
the nameplate. The appliance must be connected to the electrical mains and earthed in
compliance with the relevant regulations and requirements. The appliance is able to withstand
short fluctuations in voltage of no more than 15% less or 10% more than the rated voltage
stated on the nameplate. If the power supply lead has to be replaced, this operation must only
be carried out by a qualified technician. The socket must be accessible after the appliance has
been placed.

Product Description

1. Body
3. Drip tray
5. Adjustable foot
7. Thermostat Knob
There is a freezer compartment in the upper section of the unit that can be closed by a door.
The main storage area is under the freezer compartment.

Before using for the first time

– Remove any exterior and interior packaging materials completely, including the adhesive
strips.
– Before it is connected to the mains, the unit must be thoroughly checked for transport
damage, including its power cord.
– Clean the unit as described in the section Maintenance and Cleaning.
– To ensure proper functioning, wait for around 2 hours before connecting the unit and
switching it on once it has been positioned.
– When the unit is first switched on, a slight smell may be noticed. However, this will
disappear once the cooling process has begun.
2. Freezer Compartment
4. Crisper (Vegetable box)
6. Shelf bar
8. Glass shelf
4
Tabla de contenido
loading

Tabla de contenido