Note
Before use, make sure that you insert the batteries in the measuring
station first and then in the base station.
5. Installation
Note – Installation
• We recommend initially placing the base and measuring stations
in the intended locations without installing them and making all
the settings described in 6. Operation.
• Only install the stations once the appropriate settings have been
made and a stable wireless connection is established.
Note
• The wireless transmission range between the measuring and base
stations is up to 30 metres in open spaces.
Before installation, ensure that wireless transmission will not
be disrupted by interference or obstacles like buildings, trees,
vehicles, high-voltage lines, etc.
• Before the final installation, ensure that there is sufficient
reception between the intended installation locations.
• When installing the measuring station, ensure that it is protected
from direct sunlight and rain.
• The international standard height for measuring air temperature is
1.25 m (4 ft) above ground.
5