3. ASSEMBLY INSTRUCTIONS
STEP 1: OPENING OF THE PACK
Open the carrying bag (Fig.1) and take the playpen out. Detach the foldable mattress from the playpen
by unfastening the self-fasting straps (Fig. 2) to release the playpen.
Fig.1
Fig.2
STEP 2: SECURING THE PLAYPEN
a.Unfold the structure slightly to push the sides of the playpen apart (Fig. 3).
IMPORTANT
Start by unfolding the playpen by pushing the sides apart. The bottom of the playpen( in the
centre) should be lowered last.
b.Follow the instructions illustrated Fig.4a and Fig.4b on both sides at the same time.
Fig.4a
Fig.4b
SIDE A
SIDE A
(with opening)
(with opening)
c.Finish by banging down on the bottom of the playpen( Fig .5) to secure the blocking mechanism.
Fig.5
Fig.3
04
STEP 3: Install the bassinet
a.Before installing, remove the foldable mattress from the bottom of playard, place bassinet inside the
playard and attach the zipper to the top rails. Fig.6-1
Fig.6-1
Fig.6-2
Make sure the zipper is securely attached to the top rails
b.Insert the metal tube together in the bottom of the playard as shown, MAKE SURE tubes are
connected before installing the foldable mattress. Fig.6-3 Slip the foldable mattress into the bottom of
the bassinet. Fig.6-4
Fig.6-5
Press the buttons on both sides of the playpen, and move the top rail down. Fig. 6-5
The top rail and the second layer are fixed with a zipper. Fig. 6-6 Fig.6-7
Note
The lifting function of the playpen must be operated on both sides of the bed.
Fig.6-3
Fig.6-4
Fig.6-6
Fig.6-7
zipper
05