Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
www.costway.com

PACKING LIST

Stand-up Paddle Board
3-shafted aluminum adjustable oar
Hand pump w/pressure gauge
Valve Wrench
Repair kit
Professional carry bag
Middle FIN
Owner's Manual
SET-UP PREPARATION
1. Unfold the board from the packaging.
choose a smooth and clean surface to unfold board. Roll out the SUP board until
it is laying flat with top side facing up.
2. Valve operation
Follow the instructions below for valve operation and correct inflation and
deflation procedures.
The board's inflation valve is located near the nose of the board. To close off the
valve for inflation, make sure that the center valve pin is in the "UP" position. If it
is in the "DOWN" position, press the valve pin to "UP" position.
To open the valve for deflation, press down on the valve pin (need not to turn it),
make sure that the center valve pin is in the "DOWN" position,
Be careful of any sand or debris around the valve area when deflating as small
particles could become airborne with the release of the air pressure.
Always lock the valve cover over the valve stem when in use. This will prevent
accidental air release and entrance of any particles into the air chambers.
4
Tabla de contenido
loading

Este manual también es adecuado para:

143709854516893026540813234910654573026987402931

Tabla de contenido