1. From the Power Drive.
2. Fully open front chuck of power drive.
3. Slide the base assembly onto the support arms of the Power Drive (figure 1).
4. Align the notched flats of the drive shaft with the jaws on the 300 Power Drive chuck.
5. Close and tighten the front chuck.
1. Pipe ends must be cut square. Do not use cutting torch.
2. Pipe out-of-roundness must not exceed the total O.D. tolerance listed in groove specifications.
NOTE! Determine out-of-roundness by measuring maximum and minimum O.D. at 90 degrees apart.
3. All internal or external weld beads, flash or seams must be ground flush at least 2" back from pipe end.
NOTE! Do not cut flats on gasket seat area.
Diameter (in.)
2
21/2
3
31/2
4
41/2
5
6
8
10
12
MOUNTING GROOVER ONTO POWER DRIVE
Figure 1
PIPE PREPARATION
PIPE/TUBING LENGTH
Min. Length ( in./mm )
8/203
8/203
8/203
8/203
8/203
8/203
8/203
10/254
10/254
10/254
10/254
Max. Length ( in./mm )
36/914
36/914
36/914
36/914
36/914
36/914
36/914
28/711
24/914
24/914
24/914
13