Wall Mounting - Beko BHCB63640B Manual Del Usuario

Ocultar thumbs Ver también para BHCB63640B:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
5
Installation of appliance

5.3 Wall Mounting

• Wall must be flat, straight and have the suffi-
cient bearing capacity.
• Depth of drilling holes must comply with the
length of bolts.
• The bolts and dowels provided are suitable for
brick walls. For other construction material (e.g.
drywall, plate, porous concrete), suitable fixing
dowels and nuts shall be used.
(Figure 7)
CAUTION: Before drilling, ensure
A
that there are no power, gas or wa-
ter pipes in the close proximity of the
drilling locations.
Draw a mid location line from the ceiling perpen-
dicular to the lower edge of the hood.
Fix the assembly scheme on the wall. For points
A and B, take the maximum dimensions of the
hood as reference, and drill points A and B you
have marked with a Ø6mm drill bit, and tap Ø6mm
plastic wall plugs. Install the chimney connection
plate to the wall with 2 pieces of 3.9x22 screws
(Figure 8).
Cooker Hood / User Manual
To install the hood body, drill points C, D, E, F spec-
ified in the installation template with a Ø10mm
drill bit and tap Ø10mm plastic dowels to these
points (Figure 8).
Install 2 pieces of 5.5x60 mounting screws to
points C and D with a clearance of 5 mm between
the screw head and the wall (Figure 8).
(Figure 8)
Install two pieces of hanging plates to the body of
the hood with M5x35 mounting screws (Figure 8).
(Figure 9)
Hold the cooker hood by its body and place it on
the mounting screws on the wall and tighten the
screws (Figure 9).
Secure the cooker hood with a 5.5x60 screw to
the wall through the mounting hole on the interior
of the appliance (Figure 9).
13 / EN
Tabla de contenido
loading

Este manual también es adecuado para:

Bhcb63640bh

Tabla de contenido