Grohe Taron 27 003 Manual Del Usuario página 4

Idiomas disponibles

Idiomas disponibles

i959311.book : i95931us.fm Seite 1 Freitag, Juli 13, 2001 9:37 AM
Application
In order to ensure correct operation, a pressure of at least 21.75 psi is
required at the shower system.
Important:
Operation with instantaneous heaters (electrically or gas operated) is
not possible.
All thermostats are adjusted in the factory at a flow pressure of 45 psi,
on both sides.
If temperature deviations should occur on account of special installation
conditions, the thermostat must be adapted to local conditions (see
Adjustment).
Technical Data
Minimum flow pressure
Max. operating pressure
Recommended flow pressure
Test pressure
Flow rate
Hand spray
max. flow rate 9.5 l/min or 2.5 gpm/ 80 psi
Per side spray
max. flow rate 9.5 l/min or 2.5 gpm/ 80 psi
Overhead spray
max. flow rate 9.5 l/min or 2.5 gpm/ 80 psi
Max. water temperature at hot water inlet
Recommended max. flow temperature
(for energy saving)
Safety stop
Hot water temperature at supply connection at least 4 °F (2
than mixed water temperature
Cold water connection
Hot water connection
If static pressure exceeds 72.5 psi, a pressure reducing valve must be
fitted.
Scope of delivery, see fold-out page II.
Tools required, see fold-out page I.
Installation
Make up unions, if not yet in place.
For union dimensions for cold and hot water connection, see fold-out
page III Fig. [1].
The cold water supply must be connected on the right and the hot water
supply on the left.
For subsequent installation it must be ensured that the union
dimensions correspond to Fig. [1].
Connections and fastenings, see Figs. [2] to [4].
For individual components, see Scope of delivery, Fig. [V].
1. Drill ø6mm (ø15/64") fixing holes for mounting plugs, see Fig. [2].
2. Insert mounting plug (B) and screw in stud (B1), see Fig. [3].
3. Install accompanying elbow unions (A). If S-unions are present,
remove and replace with elbow unions (A), see Fig. [4].
Seal the elbow unions at the tiled wall with sealing compound.
Flush pipes thoroughly
Please pass these instructions on to the user of the fitting.
1
The right to make technical modifications is reserved.
English
Fitting assembly, see Figs. [5] to [8].
For individual components, see Scope of delivery, Figs. [I] and [V].
1. Suspend fitting assembly on the two studs (B1), align vertically and
fasten loosely with the fixings (D), see Fig. [5].
2. Mark additional fixing holes, see fold-out page IV Fig. [6].
3. Remove fitting assembly and drill remaining holes for ø6mm (ø15/64")
mounting plugs, see Fig. [7].
4. Suspend fitting assembly again and fasten using the accompanying
fixings (D).
5. Unevennesses between the wall and fitting assembly can be
compensated by means of the 3 adjusting screws (E) using
a 17mm (11/16") open-ended spanner, see Fig. [6].
6. Connect hoses (F) with accompanying seals (F1) and elbow
unions (A), see Fig. [8].
Spray hose and hand spray, see Fig. [9].
21.75 psi
For individual components, see Scope of delivery, Figs. [III] and [IV].
145 psi
- Connect spray hose (G) to hand spray (H).
29 - 72,5 psi
232 psi
Glass panel, see fold-out page V Fig. [10].
For individual components, see Scope of delivery, Figs. [II], [V]
and [VII].
1. Undo seal (J1) beginning from the bottom; the aperture (J2) must
ƒ
176 °F (80
C)
remain unobstructed.
2. Fit glass panel (J) onto the overhead spray arm, hand tighten
ƒ
140 °F (60
C)
nuts (K), attach fixing rings (L) and tighten using installation tool (L1).
ƒ
100 °F (38
C)
Note: Keep installation tool (L1) for possible future maintenance
ƒ
C) higher
work on the shower system.
3. Attach escutcheons (L2) to the side sprays.
right
left
Overhead spray, see Fig. [11].
For individual components, see Scope of delivery, Fig. [VI].
- Attach overhead spray (O) and install pre-mounted set screw (O1)
using the accompanying 2.5mm hexagon socket spanner.
Shut-off knob (P) operation
Shut-off knob in central position
Turn shut-off knob clockwise
Pull and
turn shut-off knob anti-clockwise
Adjusting the economy stop
Volume adjustment for side sprays, see Figs. [12] and [13].
• The flow rate is limited by a stop adjusted at the factory.
If a higher flow rate is required, the stop can be overridden by
depressing the economy button (R4), see Fig. [12].
To adjust the stop, proceed as follows:
1. Close shut-off valve.
2. Lever out cap (R1) and remove screw (R2), see Fig. [12].
3. Remove shut-off knob (R), splined adapter (R3) and economy
stop (S), see Fig. [12].
4. Attach economy stop (S) in the desired position. For adjustment
range, see Fig. [13].
5. Reinstall splined adapter (R3) and shut-off knob (R) with economy
button (R4) pointing to the right. Install screw (R2) and reinstall
cap (R1), see Fig. [12].
= closed
= aperture to hand spray
= aperture to overhead spray
loading