PARTS
1 Vacuum pressure gauge
2 Extraction hose with shut-off valve
3 Compressed air connection
with shut-off valve
4 Plastic suction pipe, 3.5x5.8x910 mm
4 Plastic suction pipe, 4.5x6.0x910 mm
4 Plastic suction pipe, 6.5x8.0x910 mm
4 Metal suction pipe, 5.0x6.0x710 mm
4 Metal suction pipe, 7.0x8.0x710 mm
5 Measuring cylinder with scale
6 Shut-off valve
7 Measuring cylinder screw fitting
8 Storage cylinder
9 Oil tank
EXTRACTION
Close the compressed air valve for emptying.
The valve is closed when the handle of the valve is positioned
crosswise to the flow direction.
Close the shut-off valve under the measuring cylinder.
The valve is closed when the butterfly handle of the valve is positioned
crosswise to the flow direction.
Open the shut-off valve at the tank base.
The pipe elbow of the emptying hose must always be hung in at the
top of the unit. The outlet of the emptying hose must never be lower
than the oil level otherwise the oil may run out of the hose.
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed