PRELIMINARY
P
C
C
RELIMINARY
HECK OF
ONTENTS
Having opened the package, start by checking the contents.
UPS
Metal slides, Guarantee document, User manual,
Cd-rom containing the UPS management software,
Serial connecting cable, 4 battery fuses (to be
inserted in the "SWBATT" fuse holders), Short circuit
bar (with 3 fastening screws)
I
UPS
B
B
NSTALLING THE
AND THE
ATTERY
When installing the equipment, the following points should be considered:
§
The wheels are to be used exclusively for fine positioning, and thus for small distances only.
§
The plastic parts and the door are not to be used for gripping or pushing the UPS.
§
Sufficient space should be left in front of the equipment for it to be turned on/off and maintenance operations to be
performed on it ( ≥ 1.5 mt )
§
The rear part of the UPS should be set at least 30 cm from the wall, to enable the air blown by the ventilation fans to
flow away correctly
§
No objects should be left on its top surface
Having set the equipment in position, secure it by engaging the brake rod (see "Front Views of the UPS" point 8) situated below
the connecting terminals.
S
T
G
A
TEPS TO BE
AKEN TO
AIN
CCESS TO THE
The operations indicated below are to be performed with the UPS disconnected from the mains powers,
turned off and with all the switches and fuse holders of the equipment open.
Follow the instructions provided below to open the UPS:
§
Open the door by pressing on the top right-hand area of the door
§
Remove the terminal and switches cover (see "Front Views of the UPS" ref. 7)
Having completed the installation operations inside the equipment, replace the terminal cover and close the door.
All manuals and user guides at all-guides.com
BATTERY BOX (optional)
Metal slides, Guarantee document, Cable for connecting
the Battery Box to the UPS, 4 battery fuses (to be
inserted in the "SWBATT" fuse holders)
OX
T
UPS / B
B
ERMINALS OF THE
ATTERY
OX
65
PRELIMINARY
E
C
LECTRICAL
ONNECTIONS
WARNING: a 4-wire three-phase distribution system is required for the three-phase input connection. The
standard version of the UPS must be connected to a TT, TN or IT type 3-phase power line + neutral + protective
earth (PE), in compliance with the IEC 60364-3 specification; therefore phase rotation must be respected.
Optional TRANSFORMER BOXES are available to convert the distribution system from 3 to 4-wires.
D

IAGRAMS OF CONNECTIONS TO THE ELECTRICAL SYSTEM

NOTE: for the following diagrams, in cases of single-phase connections on the input line, instead of 3P=N, please read P+N.
UPS with no variation of the neutral arrangements
UPS with galvanic isolation on input
Note: For three-phase connections, the transformer must be suitably sized to operate off the bypass
UPS with galvanic isolation on output
66