Installation Of The Electrode Weld Cable; Installation Of The Wire Reel; Installation Of The Gun / Cable Assembly; Installation Of The Welding Power Source - ESAB MIG 4HD Manual Del Usuario

Tabla de contenido
All manuals and user guides at all-guides.com
SeCTION 3
INSTAllATION
3.8 INSTAllATION OF The eleCTRODe CABle
Install the electrode weld cable between the wire drive assembly and the control box
assembly. The cable MUST be routed through the center of the boom arm steel tube.
Tighten all connections completely to ensure a good electrical connection.
3.9 INSTAllATION OF The WIRe Reel
Load the wire reel with a coil of wire so as to dereel off the side of the coil closest to
the conduit bushing. Thread the wire through the entire length of conduit to the
drive rolls to feed through the gun cable. See 2" Spindle Assembly diagram.
3.10 INSTAllATION OF The GUN / CABle ASSeMBlY
Install the gun / cable assembly per manual provided with the torch.
3.11 INSTAllATION OF The WelDING POWeR SOURCe
Install the welding power source per manual provided with the power source.
25
Tabla de contenido
loading

Tabla de contenido