3.2 INSTAllATION OF The FUll heAVY DUTY PACKAGe (FhD)
(Wire Drive & Control Box Assembly mounted on boom end)
A.
INSTALLING THE WIRE FEEDER ASSEMBLY
Before installing the Wire Feeder Assembly, remove the wire spool support from the Wire
Feeder Assembly base by unscrewing the (4) mounting screws. DO NOT INSTALL THE
WIRE FEEDER ASSEMBLY WITH THE SPOOL SUPPORT ATTACHED. SPOOL SUPPORT EX-
CEEDS WEIGHT LIMIT ON BOOM. Mount the Wire Feeder Assembly on the bracket using
the (4) #10-32 x .50 screws. Mount the bracket (p/n 0558003735) to the end of the boom
arm using the (2) 3/8-16 x 1.00 bolts, flat washers and lock washers. After the Wire Feeder
Assembly is in place, completely tighten the bolts.
NOTE: No cage will be used in this application.
3.3 INSTAllATION OF The POWeR INPUT CABle ASSeMBlY
In FHD package, the Power Input Cable Assembly will run from the power source to
wire feeder assembly mounted on the end of the boom arm. In the SHD package, the
power input cable assembly will run from the power source to the control box mounted
on boom mast and from the control box to the wire drive / drive box assembly. Install
the Power Input Cable Assembly as required. The pin end of the Power Input Cable
Assembly connects to the power source. The socket end of the Power Input Cable
Assembly connects to the control box assembly. Tighten all connections completely to
ensure a good electrical connection.
23
Bracket P/N 0558003735
INSTAllATION
Wire Feeder Assembly