Grohe Seabury 24 020 Guia De Inicio Rapido página 5

Ocultar thumbs Ver también para Seabury 24 020:
Application
Operation is possible in conjunction with:
- Pressurized storage heaters
- Thermally controlled instantaneous heaters
- Hydraulically controlled instantaneous heaters
Operation with low-pressure storage heaters (displacement water
heaters) is not possible.
Technical data
• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Water connection
Notes
• Installation of backflow protection must comply with local codes
and regulations.
• Major pressure differences between cold and hot water supply
should be avoided.
Installation
See dimensional drawing on page 1.
Flush pipes thoroughly!
Side valves
• Valve marked with "L" (left close) on the top edge of the
headpart (A) with blue tape should be mounted on the right (cold
water) side, see fig. [1].
• Valve marked with "R" (right close) on the top edge of the
headpart (A) with red tape should be mounted on the left (hot
water) side.
1. Screw the mounting set (B) to the bottom of the thread of the
side valve (C), see fig. [1].
Make sure that the rubber washer (B1) is on the top of the fiber
washer (B2).
2. Insert the side valve (C) through the basin hole from below.
3. Place the escutcheon O-ring (D1) on the basin and screw down
the escutcheon (D) until it stops.
4. Screw the cap (E) down to the escutcheon (D).
5. Cross handle (F):
- Secure the handle (F) to the stem of the cartridge (A).
Lever handle (G):
- Close the cartridges (clockwise for the hot side and counter-
clockwise for the cold side).
- Install the lever handle to the stem of the cartridge and be sure
that the lever points away from the spout.
- Screw the brass nut (G1) into the cap (E) until tight.
- Screw the ring (G2) to cover the brass nut (G1).
6. Tighten the mounting set (B) from below to secure the valve.
Vacuum breaker
1. Cover the extra hole with enclosed hole cover (H), see fig. [2].
2. Insert the vacuum breaker body with seal (I) and nut (I2) through
the basin hole from below, see fig. [3].
3. Slide on seal (I1) with ring (J) and screw on nut (K).
The distance from the top of the body to the bottom of the ring
must be 2 3/16", see fig. [2].
English
13 L/min or 3.4 gpm/45 psi
7.25 psi
14.5 - 72.5 psi
145 psi
232 psi
176 °F
cold - Right hand
hot - Left hand
4. Secure vacuum breaker body to the basin by tightening
nut (I2), see fig. [3].
5. Slide on tube (L) and cover (M), see fig. [4].
6. Tighten the connection tee (N) to the vacuum breaker body with
connection nut (O).
Diverter, see fig. [5].
- Insert the diverter (P) and the lift rod assembly through the basin
hole from below.
- Secure the diverter with the mounting set (Q).
- Secure the escutcheon with nut (R).
- Mount the diverter knob (S) to lift rod assembly (S1).
Verticle spray, see fig. [5].
- Insert body with seals (T) from below.
- Slide on seals (T1) and secure with nut (U).
- Jet-height can be decreased by turning the nozzle (V) to the left,
turning to the right increases jet-height.
- Screw on spray face plate (U1).
Fit pop-up drain (28 957), see page 2, ensure that flange of pop-
up drain is sealed.
Connect wideset bidet, see figs. [6] and [7].
- For this purpose the supply pipes must be installed on to the
angle stops.
- The cold water supply should be connected on the right, the hot
water supply on the left side.
- Connect both side valves to the connection tee via the two short
flexible hoses.
- Connect the marked end of the hose (look for groove on the nut)
to the tee of the vacuum breaker and the other end to the diverter
elbow.
- Connect the diverter to the verticle spray via the long flexible
hose.
Open cold and hot water supply and check connections for
leakage.
Maintenance
Inspect and clean all parts, replace as necessary and grease with
special grease (order no. 18 012).
Shut off cold and hot water supply.
I. Ceramic headpart, see page 2.
- Remove handle (45 767, 45 768) and cap.
- Unscrew the ceramic headpart (45 882 - right close, 45 883 - left
close) using a 17mm wrench.
II. Vacuum breaker, see fig. [8] and page 2.
- Pull off cover (M) and tube (L), see fig. [8].
- Remove circlip (W), pull out and replace double-ball vacuum
breaker (X).
- Loosen nut and replace check valve (08 565), see page 2.
III.Vertical spray, see fig. [9].
Screw off spray face plate (U1) and nozzle (V).
Assemble in reverse order.
Replacement parts, see page 2 ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
4
loading