Maintenance

It is assumed that you have read and understood the chapters "First things first" and "Safe
operation".
After cleaning, all parts must be lubricated according to the maintenance schedule.
Check nuts and screws according to the maintenance schedule for tight fit.
When topping up with hydraulic oil, maximum cleanliness is required.
Check hydraulic hoses and tubes acc. to the maintenance schedule for damage and ag-
ing , replace them if necessary.
The electrical system must be checked for damage and function acc. to the maintenance
schedule.
If the machine is not to be used for more than 2 months it is recommended to close the
fuel valve while the engine is running and to wait until the engine stops. Make absolutely
sure to avoid fuel staying in the carburetor for longer periods of time.
Always make sure that the battery is well charged, if necessary charge the batteries with
the battery charger. Charging 12 V 0.6 A with an automatic mains charger.
The machine may suddenly trap the operator or third persons, cause them to fall over or
run them over.
Cleaning and maintenance work and the removal of safety equipment should only be
carried out when the engine is turned off and the immobilisation brake applied.
Disconnect the spark plug terminal.
Before undertaking any kind of work on the machine, let the machine cool down to a
temperature below 50 °C.
Replace defective parts.
The hydraulic system may be pressurised.
When searching for leakages, suitable protection must be used (protective goggles and
protective gloves).
The machine must be cleaned thoroughly before any work is undertaken on the
hydraulic system. Maximum cleanliness is required.
Repairs in the hydraulic pump must only be carried out by an authorised Rapid dealer.
Machine no. from CH 1001
Note
Caution
EN