Portability Kit Installation; Tools Required - Powermate PM0133250 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PORTABILITY KIT PART NUMBER: 0070748
TOOLS REQUIRED: 10x13 mm wrench, screw driver, 4 mm and 5 mm hex keys (provided in tool kit), block(s) of wood
(2" x 4"minimum), and rubber mallet. Refer to the parts list on pages 58 and 59.
After removing the generator from the carton, the proper handle and wheel configuration can be installed by using the tools
included in the tool kit. Just follow the Steps listed below.
Your generator is shipped from the factory with the top foam C-shaped handle temporarily installed to the generator frame.
This handle must be removed and the appropriate handle extensions installed.
1.
Remove the Fascia panel with the 4mm Allen head wrench and the 10mm wrench provide in the tool kit to access the
supporting handle bolts and nuts. These fasteners will be re-used.
2.
Remove the two curved head screws using the 13mm wrench, being careful not to lose the silver bushings as shown.
These fasteners will be re-used.
English

PORTABILITY KIT INSTALLATION

PORTABILITY KIT INSTALLATION
8
Customer Hotline 1-800-445-1805
Tabla de contenido
loading

Tabla de contenido