Paradigma HSU Instrucciones De Montaje página 6

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Installing the HSU, HSM
Please read carefully through these installation instructions and the accompanying
guidance notes and diagrams prior to installation.
Installation instructions
Thermostat
pocket
for sensor
in the
flow line
Thermostat
pocket
for sensor
in the
return line
Mixer
HSU = Heating circuit station for an unmixed heating circuit
HSM = Heating circuit station for a mixed heating circuit
1. Description of the heating circuit station
The HSU and HSM heating circuit stations are pre-
assembled units. The electrical wiring is compliant with
VDE regulations. The entire flow and return pipeworks
are pre-assembled and sealed. Only flat-sealing screw
fittings are used.
The cables are connected to the heating circuit station
with screw fittings that need to be ordered separately.
The insulation shell is made from water vapour expan-
ded polypropylene (EPP). This material is environ-
mentally friendly and 100
6
THM1984 V1.2 11/12
125
recyclable.
250
125
Information for Your Safety
Modifications to the heating circuit station
should only be carried out by a specialist.
Observe the VDE regulations. Electrical
connections to 230 V mains cables are
to be implemented by an approved
electrician.
Always disconnect the pump and mixer
from the mains when working on the
heating circuit station.
Please also consult the technical guidance
notes and wiring diagrams for the control-
ler, pump and mixer.
© by Ritter Energie- und Umwelttechnik GmbH & Co. KG. Subject to technical modifications.
Gravity brake
(adjustable by turning
the ball valve handle
through 45°)
Pump
Distributor bar
(optional)
Wall bracket
(optional)
Tabla de contenido
loading

Este manual también es adecuado para:

Hsm

Tabla de contenido