Glacier bay 2114SSHD Guía De Uso Y Cuidado página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
1
Connecting the shelves to the tubes
noTe: If your tub has a low ceiling (approximately 68 in.
from the top of the tub to the ceiling), use the short tapered
tube (D) in place of the second long tapered tube (C).
noTe: Shelves (E) can be adjusted by moving the
wedges (AA) up or down.
□ Place a wedge (AA) (tapered or rounded end up) on one of
the long tapered tubes (C) approximately half way down.
□ Slide a shelf (E) down the tube and fit over the wedge.
□ Place a wedge (AA) (tapered or rounded end up) on the
long tapered tube (C).
□ Slide a shelf (E) down the tube and fit over the wedge (AA).
□ Repeat this process for other long tapered tube (B) and
remaining shelves (E).
2
Connecting the two tubes
□ Place the tapered end of the tube (C) with the two
shelves (E) on it into the untapered end of the other
tube (C) with the shelves (E) on it.
AA
E
E
E
E
5
Please contact 1-877-527-0313 for further assistance.
C
E
AA
E
AA
C
top shelf assembly
tapered end
bottom shelf assembly
C
HOMEDEPOT.COM

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

209 032

Tabla de contenido