Electrical Connections; Installation; Preliminary Checks; Installation Dimensions - FAAC 391 Manual De Instrucciones

Ocultar thumbs Ver también para 391:
Tabla de contenido

4. ELECTRICAL CONNECTIONS

• The lay-out below refers to an installation with two
motors, with all safety and signalling devices
connected.

5. INSTALLATION

5.1. PRELIMINARY CHECKS

To ensure a correctly operating automated system, the structure
of the gate to be moved must satisfy the following requirements:
• The mechanical construction elements must comply with the
provisions of the EN12604 and EN 12605 standards.
• leaf length must conform to the operator characteristics (see
paragraph 2)
• sturdy, rigid gate structure, suitable for the automated system
• smooth, uniform gate movement, without any friction and
jamming during the entire opening;
• adequately sturdy hinges, in good condition
• an efficient earth socket for connection of the operator
We advise you to carry out the metalwork jobs if any,
before installing the automated system.
The condition of the gate structure directly influences
the reliability and safety of the automated system.

5.2 INSTALLATION DIMENSIONS

Procedure for finding the securing position of the operator, using
Fig.4 to help you:
• measure dimension "A" of the gate and trace a horizontal
line on the graph on the measured value, this line to cross the
whole graph.
• you will obtain the maximum permissible angular opening
according to dimension "A" of the graph.
• select the opening range you require
• select dimension "B" so that it intersects the horizontal line
(dimension "A") inside the required opening range.
• If dimension "A" permits opening values greater than
the opening value selected, the value of dimension
"B" can change up to the maximum permissible
opening value.
• Make sure that the minimum dimension of 450mm in
Fig.4 is observed.
• When the operator has been installed, check if
dimension "X" in Fig.4 is minimum 500 mm. If dimension
"X" is less than 500mm, run an impact test on the point
indicated in Fig.4, as described in UNI EN12445
standard, and make sure that the measured values
conform to the specifications of UNI EN 12453 standard.
1
G
e
r a
m
t o
r o
3
9
1
E
2
G
e
r a
m
t o
r o
3
9
* 1
3
F
a l
h s
n i
g
a l
m
p
4
K
e
y
o -
p
e
a r
e t
d
e s
e l
c
o t
s r
i w
c t
h
5
P
h
o
o t
c
e
t l l
a r
s n
m
t t i
r e
6
P
h
o
o t
c
l l e
e r
c
e
v i
r e
7
E
e l
c
r t
c i
o l
c
k
* *
*
o (
n
y l
o f
t r
w
o
e l
f a
a
p
p
c i l
t a
o i
n
) s
* *
o (
b
g i l
a
o t
y r
f
r o
e l
f a
> L
2
m
)
F
• If the thrust values are not within the values specified
in UNI EN12453 standard, the zone indicated in figure
4 MUST be protected with a protective device
conforming to the UNI EN12978 standard.
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
. 3
IG
180
190
200
210
220
90°-95°
• The operator was studied and made to be secured
vertically (Fig.5). The operator cannot be installed in
other positions.

5.3. INSTALLING THE OPERATOR

When you have established dimensions "A" and "B", you can
install the operator as follows:
Loosen by about 1/2 turn the four securing screws of the
upper housing (Fig.6 ref. ) and withdraw the housing. Set
the operator for manual operation, see paragraph 7.
1
1
8
B
450 Min.
X
a
B
X X
1
F
. 4
IG
F
. 5
IG
F
. 6
IG
Tabla de contenido
loading

Este manual también es adecuado para:

391 e

Tabla de contenido